We refurbished and modernised a second floor laboratory, including the creation of pods with gas and power for student use.

The whole room was cleared and all fixtures and fittings removed, including floor covering and pipework. The engineer laid new gas and power under the floor boards to fit into special pods taking gas taps and power boxes.

The ceiling was lowered and LED panels installed with new ceiling tiles. A modern, compliant gas safety system was installed together with non-slip safety flooring.

The whole area was decorated and benches, sinks and bespoke teacher’s desk fitted to modernise the Laboratory.

“I would certainly use Westcare again.”

What they say

“The installation was completed on time and produced two high quality, modern labs. I would certainly use Westcare again as part of refurbishment programmes in the future.”

John McConnell
Estate Manager
Devonport High School for Boys